Chicago Yellowstone and Pacific Model Railroad

My activities in model railroading.

▼
Wednesday, April 28, 2021

Looking Around the Interim Layout, Part One

›
       In this post, we will look at old photos of the interim layout. Railfanning the layout as it were.  . Alco S-2 22 is spotting a load ...
Friday, April 9, 2021

West Linncott

›
      I had mentioned the West Linncott industrial area in a previous post.  During the rebuild to the interim layout, about a two foot by n...
Thursday, March 25, 2021

Video of scene on first run.

›
 I took a short video of the northbound train with RS-1 160 leading near the Central District commercial.  160 rounds the curve as traffic w...

First run on the interim layout.

›
       After the taking down of the old layout and rebuilding the benchwork, enough of the new project was in place to take a train around. ...
Saturday, February 13, 2021

The Interim Layout

›
       After really deciding to go on with the big change, the disassembly and moving about of the components began.         Scratch one duc...
Sunday, January 24, 2021

A Change From The "Big Layout."

›
      I the previous entry I described some of the big layout begun in the early 2000s.  By 2015, there was so much unfinished and there wer...
Sunday, January 17, 2021

The Old Layout

›
       In the early 2000s I started the "big" CY&P.  It was a huge project and filled most of a 16' X 26' area.  It ha...
›
Home
View web version

About Me

arbe1948
View my complete profile
Powered by Blogger.